8 miles of hiking • 2750' elevation gain •
I'm mad that someone took the Wakeena Springs Stone/Carved sign away. I think that the amount of wood it took to make the sign, to announce the closure of the Benson Bridge could be used to patch the Benson Bridge. I am serious about this. see attached pic. Busy Day on the trails. Back to the car just as the rains came. Win.
Comments
Agreed. At least 50 people above the paved switchbacks.
Pablo
February 23, 2014
I wonder if there is something about winter temperatures that prevents work on the bridge. Seems like the traffic on Wahkeena has increased considerably since the closure.